Projects

Commercial

Role

Coordination

Completed

2016-2017

Launch

2018

01.-

Scope

Scope

A challenging underground services car park (25,000m2), included 13 satellite plantrooms and distribution for 10 tower blocks and 2 dedicated risers to roof plant areas.

The MEP services included pipework to 400mm diameter and multiple Durasteel busbar electrical services routes.

02.-

What we did

Ideal solution

Cadan Design provided our client with an ideal solution for accurate multi-disciplinary modelling and efficiency, by completing and delivering the coordination of this super-sized sub terrain carpark within a 10-week period from ‘For approval’ to ‘Approved’ status for construction.

03.-

Results

A good approach

Cadan Designs approach to coordination improved the services layout from the original design scheme as such it included the reduction in pipe lengths, reduction in the number of different pipe levels,and reduction in changes of levels. It was estimated a saving of 12% of pipework and fittings was potentially made of the designed scheme along with installtion time. The model was issued with 0 Clashes, enabling the client to save both money and time on all fronts. To enhance the project, we completed module designs for the roof plantroom areas.