Sidebar

Contact Us

5 Hill View Studio, 160 Eltham Hill, London, SE9 5EA
ehtc

Copyright © 2017 All rights reserved Designed by Cadan Design Limited

Images and content on this site are property of Cadan Design, no replicaion in any part is permitted without proir written consent

Technical College, London.

Balfour Beatty Construction & Engineering Services, October 2013
Multi disciplinary modelling, ARC, STR & MEP, Prefabrication modules & Skids, As Built Laser Scanning

Cadan Design was engaged by both the main contractor and MEPH services sub contractor on this joint venture project.

To be able to provid a complete a BIM model, Cadan Design used the entire project design information to model the Architectural, Structural and M.E.P.H. elements of the 3 new buildings and existing building, taking drawings and project across a two year, two phase period to final handover in October 2013.

Our objective was to provide accurate installation drawings for the main services, our manufacturer specific content libraries allowed us to provide accurate prefabriction and information for workshop drawings and offsite manufacture of the modules and plant skids. We utilised material take off, providing cut sheets for the module lengths and quantities. The main services coridoors and risers where then installed over a 2 week period, devliering the project phase pre schedule. Additionally we provided the record information and 3D 'As Built' conditions laser scan of the plantroom area.