The Problem

Scope

A district heating system with a dedicated multi storey energy centre building supplying low temperature hot water to a new housing development. The design has an initial 6 boiler, 6KW district heating system, 1 CHP engine and 2x 167,000-litre thermal stores.

The installation also must allow for a future upgrade to a 12-boiler system, additional 167,000-litre thermal store, 3 CHP engines and up to 14 residential floors above.

02.-

the process

What we did.

As part of the process, we coordinated the entire building from entry point to termination and included the total re-configuration of the energy center plantroom. Our improved scheme allowed for superior maintenance and access space to all equipment, along with improved plant removal scheme and fire escape routes. A reduction of around 60% was made on the main flow and return headers and this was supported by a new steel frame design. The reconfiguration allowed for the flues to be rerouted within the plantroom enabling the services to be taken off the front facade and now be within the plantroom.

03.-

Conclusion

A great result

A great project and good result, we worked closely with our clients project team to provide all the necessary drawings for the phase 5 construction and phase 6 handover periods.