Context

Challenge

Cadan Design were privileged to be approached by one the UKs leading design practices to assist on the production and modelling of the stage 3 and early stage 4 design drawings for this a state-of-the-art research, development, and manufacturing centre.

The site included the design of over 50,000 square meters of facilities across 3 main buildings – an office space, a dedicated energy centre and large manufacturing area with an underground services link tunnel.

02.-

the solution

'Out of the norm'

From the ground up, we modelled this niche site, included over 22 different types of specialist ventilation systems supplied in ductwork in sizes up to 2300mm in diameter. 24 different types of water system are being supplied in pipes up to 600mm and over 80 specialised, process, chemical and gas systems were coordinated by us as the design progressed.

03.-

Conclusion

A collaborative approach

The Cadan Design team worked with the Buro Happold designers from multiple global locations, using cloud technology to help bring together this project. As coordination lead, we assisted with design coordination across the entire site including the production of over 800 design drawings for each issue.